Skip to content

[Phase 10] Backup & Recovery System #13

@ravituringworks

Description

@ravituringworks

Phase 10: Production Readiness

Overview

Implement comprehensive backup and recovery system for production data safety.

Features to Implement

  • Point-in-time recovery (PITR) capabilities
  • Incremental and full backup strategies
  • Automated backup scheduling and retention policies
  • Cross-region backup replication
  • Backup verification and integrity checking
  • Disaster recovery procedures and testing

Technical Requirements

  • Integration with existing transaction logging system
  • Storage backend abstraction (local, S3, Azure Blob, GCS)
  • Compression and encryption for backup data
  • Parallel backup and restore operations
  • Metadata management for backup catalogs
  • Recovery testing automation

Success Criteria

  • Automated daily backups with configurable retention
  • Point-in-time recovery within 1 minute granularity
  • Backup completion within acceptable time windows
  • Successful disaster recovery testing procedures
  • Encrypted and compressed backup storage
  • Cross-region backup replication for disaster recovery

Dependencies

  • Existing transaction logging system
  • Storage abstraction layer
  • Monitoring and alerting system

Estimated Effort

5-6 weeks

Metadata

Metadata

Assignees

Labels

enhancementNew feature or requestphase-10Phase 10: Production Readinessproduction-readyProduction readiness features

Type

No type

Projects

No projects

Relationships

None yet

Development

No branches or pull requests

Issue actions